Lagos manufacturing case study

A Lagos manufacturing company reduced downtime by over 90% with a PRAG system — achieving 99.8% uptime.

Problem

To reduce frequent power outages causing 12+ hours of weekly downtime, damaging expensive CNC machines.

Solutions

500KVA integrated stabilizer, inverter, and solar system designed for high-load manufacturing operations with continuous uptime requirements.

StabilizerInverterSolar Panels
RESULTS
Power Rating500KVA
Uptime99.8%
Solar Panels99.8%
Annual Savings₦15M
Life Span3X
Meadows Estate installation

Meadows Estate, Lekki Phase II

Problem

60 housing units dependent on shared generator, disputes over fuel costs, and 8-12 hour daily power cuts.

Solutions

Communal 50kW solar microgrid + 120kWh battery bank + individual unit smart metering for transparent consumption billing.

StabilizerInverterSolar PanelsLithium Battery
RESULTS
Unit Powered60
Cost Production65%
Power Supply24/7
Zenith Textile factory installation

Zenith Textile Factory, Kano

Problem

Voltage fluctuations causing 3-5 motor burnouts per month on industrial looms, costing ₦8M+ in repairs annually.

Solutions

Three-phase 250kVA servo-motor stabilizer + power factor correction capacitors + surge protection system across all production lines.

StabilizerInverterSolar PanelsLithium Battery
RESULTS
Motor Burnout0
Production Gain+22.8%
Cost Production87%
Federal Medical Centre installation

Federal Medical Centre, Abuja

Problem

Severe voltage fluctuations destroying diagnostic equipment and theatre instruments worth ₦45M annually.

Solutions

100kVA three-phase industrial stabilizer + dual-input online UPS system deployed across all critical wards and theatres.

StabilizerInverterSolar PanelsLithium Battery
RESULTS
Power Rating100KVA
Uptime99.8%
Annual Savings₦45M
Ikeja shopping mall installation

Ikeja Shopping Mall, Lagos

Problem

Daily 6-8hr outages causing ₦2.1M/week in lost sales and spoiled perishables across 42 tenants.

Solutions

200kW rooftop solar system + 500kWh lithium battery storage + three-phase hybrid inverters with remote monitoring dashboard.

StabilizerInverterSolar PanelsLithium Battery
RESULTS
Tenants Powered42
Uptime99.5%
Weekly Savings₦2.1M
Our Process

Every Installation Follows the Same Process

01

Site Assessment

We visit your site, measure load, assess infrastructure, and identify problem sources before touching any equipment.

02

Custom Design

Your system is engineered specifically for your load profile, space constraints, and budget - never a template.

03

Certified Installation

PRAG-trained engineers install to NSO standards. No subs, no shortcuts.

04

Testing & Support

We test every circuit and component, brief your team, and provide ongoing warranty and maintenance.